Lot
Schema
- id
string, auto-generated
- title
string, multilingual
The name of the tender lot.
- description
string, multilingual
Detailed description of tender lot.
- value
Value, required
Total available tender lot budget. Bids greater then
value
will be rejected.- guarantee
-
Bid guarantee
Absent in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick
- date
string, Date, auto-generated
- minimalStep
Value, required
The minimal step of auction (reduction). Validation rules:
amount should be less then Lot.value.amount
currency should either be absent or match Lot.value.currency
valueAddedTaxIncluded should either be absent or match Lot.value.valueAddedTaxIncluded
Absent in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick and Energy Service Contracting procedure - esco
- auctionPeriod
Period, read-only
Period when Auction is conducted.
Absent in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick
- auctionUrl
url
A web address for view auction.
Absent in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick
- status
string
- active
Active tender lot (active)
- unsuccessful
Unsuccessful tender lot (unsuccessful)
- complete
Complete tender lot (complete)
- cancelled
Cancelled tender lot (cancelled)
Status of the Lot.
Additionally in Energy Service Contracting procedure - esco:
- minimalStepPercentage
float, required
Minimum step increment of the energy service contract performance indicator during auction that is calculated on participant’s bid. Possible values: from 0.005 to 0.03 (from 0.5% to 3% respectively) with 3-digit precision after comma.
- fundingKind
string, required
- Lot funding source
Possible values:
budget - Budget funding.
other - Supplier funding.
Default value: other
- yearlyPaymentsPercentageRange
float, required
Fixed percentage of participant’s cost reduction sum, with 3-digit precision after comma.
Possible values:
from 0.8 to 1 (from 80% to 100% respectively) if lot:fundingKind:other.
from 0 to 0.8 (from 0% to 80% respectively) if lot:fundingKind:budget.
Input precision - 3 digits after comma.
Workflow in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick, Energy Service Contracting procedure - esco and Open procedure with publication in English - aboveThresholdEU
* marks initial state