Lot
Schema
- id:
string, auto-generated
- title:
string, multilingual
The name of the tender lot.
- description:
string, multilingual
Detailed description of tender lot.
- value:
Value, required
Total available tender lot budget. Bids greater then
valuewill be rejected.- guarantee:
-
Bid guarantee
Absent in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick
- date:
string, Date, auto-generated
- minimalStep:
Value, required
The minimal step of auction (reduction). Validation rules:
amount should be less then Lot.value.amount
currency should either be absent or match Lot.value.currency
valueAddedTaxIncluded should either be absent or match Lot.value.valueAddedTaxIncluded
Absent in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick and Energy Service Contracting procedure - esco
- auctionPeriod:
Period, read-only
Period when Auction is conducted.
Absent in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick
- auctionUrl:
url
A web address for view auction.
Absent in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick
- status:
string
- active:
Active tender lot (active)
- unsuccessful:
Unsuccessful tender lot (unsuccessful)
- complete:
Complete tender lot (complete)
- cancelled:
Cancelled tender lot (cancelled)
Status of the Lot.
Additionally in Energy Service Contracting procedure - esco:
- minimalStepPercentage:
float, required
Minimum step increment of the energy service contract performance indicator during auction that is calculated on participant’s bid. Possible values: from 0.005 to 0.03 (from 0.5% to 3% respectively) with 3-digit precision after comma.
- fundingKind:
string, required
- Lot funding source:
Possible values:
budget - Budget funding.
other - Supplier funding.
Default value: other
- yearlyPaymentsPercentageRange:
float, required
Fixed percentage of participant’s cost reduction sum, with 3-digit precision after comma.
Possible values:
from 0.8 to 1 (from 80% to 100% respectively) if lot:fundingKind:other.
from 0 to 0.8 (from 0% to 80% respectively) if lot:fundingKind:budget.
Input precision - 3 digits after comma.
Lot for Відбір управителя складного активу - complexAsset.arma
Schema
No differences from Lot, except:
- value:
AmountPercentageValue object, required
The maximum allowable amount of the manager’s fee in percentage. Bids greater than
valuewill be rejected.- minimalStep:
AmountPercentageValue object, not required
The minimal step of auction in percents. Validation rules:
amountPercentage should be less or equal to Lot.value.amountPercentage
Workflow in Reporting, negotiation procedures - reporting, negotiation, negotiation.quick, Energy Service Contracting procedure - esco and Open procedure with publication in English - aboveThresholdEU
![digraph G {
A [ label="active*" ]
B [ label="complete"]
C [ label="cancelled"]
D [ label="unsuccessful"]
A -> B;
A -> C;
A -> D;
}](../_images/graphviz-9d7d9fc4961b8e7e6bce962c2bbb9613e86eaf97.png)
* marks initial state